This was a standard practice up to the end of the 1900s and even into the early 2000s - creating heating/air conditioning duct cavities between the supporting floor joists by screwing sheet metal to the open side. The result is a kind of very leaky ductwork which causes great loss of conditioned air the homeowner has paid to heat and cool.